Performance-Based Earned Value

Performance-Based Earned ValuePerformance-Based Earned ValuePerformance-Based Earned Value
  • Home
  • Articles and Tutorial
  • HASC Objectives
  • Letters to HASC
  • Dept. of War Letters
  • Trump and OMB Letters
  • White Papers
  • About
  • F-35 Whistleblower Case
  • Contact
  • EIA-748 EVMS Std. Status
  • More
    • Home
    • Articles and Tutorial
    • HASC Objectives
    • Letters to HASC
    • Dept. of War Letters
    • Trump and OMB Letters
    • White Papers
    • About
    • F-35 Whistleblower Case
    • Contact
    • EIA-748 EVMS Std. Status

Performance-Based Earned Value

Performance-Based Earned ValuePerformance-Based Earned ValuePerformance-Based Earned Value
  • Home
  • Articles and Tutorial
  • HASC Objectives
  • Letters to HASC
  • Dept. of War Letters
  • Trump and OMB Letters
  • White Papers
  • About
  • F-35 Whistleblower Case
  • Contact
  • EIA-748 EVMS Std. Status

ARTICLES and TUTOTIAL

Defense Acquisition Magazine (formerly Defense AT&L)


Note: Download corresponding PDF files from Downloads section below.


1. Integrating Systems Engineering with Earned Value Management May 2004
EV quantitatively linked with:
​ Technical performance measurement (TPM)
​
Progress against requirements
but EVMS Standard states that EV is a measurement of the ​
quantity, not quality, of work accomplished.

EVM can be more effective as a program management tool if it is
integrated with technical performance and if the EVM processes are augmented with a rigorous systems engineering (SE) process.


2. SE and EVM Support for Performance-Based Awards, Jan. 2007


3. EVM Acquisition Reform, Nov. 2010 


4. Path to EVM Acquisition Reform, May 2011


5. A Contract Requirement Rule for Program Managers," Nov. 2015

 Recommends replacement of EVMS Standard EIA-748 with Project Management Institute Standard, PMBOK® Guide.
EVM, based on EIA-748, is used primarily by federal contractors when contractually required. A more powerful tool is the ANSI standard that is used world-wide on a voluntary basis when there are no federal requirements, PMBOK® Guide.

A Program Manager’s needs that are covered by PMBOK® Guide but are absent in EIAI-748 include:
· Technical or product baseline
· Requirements management and traceability
· Risk management


6. Better Program Management Through Digital Engineering (DE), May/June 2022


7. Better Program Management Through DE Updated, July/Aug. 2025

CrossTalk, Journal of Defense Software Engineering

8. Basing Earned Value on Technical Performance, Jan. 2013


16. Practical, Performance-Based Earned Value,” May 2006


17. Practical Software Measurement, Performance-Based Earned Value” Sept. 2001


College of Performance Management Measurable News

9. Integrating SE with EVM, Part 2, 2016 Issue No. 4


10. Performance-based EV in Commercial IT Projects, 2010 Issue No. 2


11. Integrating Risk Management with Earned Value Management (Risk Management Comes Out of the Closet), June1998

Journal of Software Management

12. Agile Earned Value and the Technical Baseline," Sept. 2009

Carnegie Mellon U./Software Engineering Institute

13. Technical Note CMU/SEI-2002-TN-016, Oct. 2002 "Using CMMI® to Improve Earned Value Management" 

Air Force Acquisition Reform Newsletter, Aerospace 2000

14. B-2 Bomber Team’s EVM Innovations Make Program Soar," Jan./Feb. 2000

Naval Postgraduate School Lecture

15. Integrate SE with Earned Value Management and Program Management, Contractually and Practically, March 11, 2020 

Downloads

1. Integrating Systems (pdf)Download
2. SE and EVM (pdf)Download
3. EVM Acquisition (pdf)Download
4. Path to EVM Acquisition (pdf)Download
5. A Contract Requirement Rule for Program Managers (pdf)Download
7. Better Program Management Through DE Updated (pdf)Download
8. Basing Earned Value on Technical Performance (pdf)Download
9. Integrating SE with EVM, Part 2 (pdf)Download
10. Performance-based EV in Commercial IT Projects (pdf)Download
11. Integrating Risk Management with Earned Value Management (pdf)Download
12. Agile Earned Value (pdf)Download
13. Technical Note CMUSEI-2002 (pdf)Download
14. B-2 Bomber Team’s EVM Innovations Make Program Soar (pdf)Download
15. Lecture, Integrate SE (pdf)Download
6. Better Program Mgt Through DE (pdf)Download

Downloads

1. Integrating Systems (pdf)Download
2. SE and EVM (pdf)Download
3. EVM Acquisition (pdf)Download
4. Path to EVM Acquisition (pdf)Download
5. A Contract Requirement Rule for Program Managers (pdf)Download
7. Better Program Management Through DE Updated (pdf)Download
8. Basing Earned Value on Technical Performance (pdf)Download
9. Integrating SE with EVM, Part 2 (pdf)Download
10. Performance-based EV in Commercial IT Projects (pdf)Download
11. Integrating Risk Management with Earned Value Management (pdf)Download
12. Agile Earned Value (pdf)Download
13. Technical Note CMUSEI-2002 (pdf)Download
14. B-2 Bomber Team’s EVM Innovations Make Program Soar (pdf)Download
15. Tutorial Integrate SE (pdf)Download
6. Better Program Mgt Through DE (pdf)Download

Downloads

16. Practical, Performance-Based EV 2006 (pdf)Download
17. Practical SW Measurement, PBEV 2001 (pdf)Download

Copyright © 2025 Performance-Based Earned Value - All Rights Reserved.

Powered by

  • HASC Objectives
  • Letters to HASC
  • Dept. of War Letters
  • Trump and OMB Letters

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept