1. Integrating Systems Engineering with Earned Value Management May 2004
EV quantitatively linked with:
Technical performance measurement (TPM)
Progress against requirements
but EVMS Standard states that EV is a measurement of the quantity, not quality, of work accomplished.
EVM can be more effective as a program management tool if it is integrated with technical performance and if the EVM processes are augmented with a rigorous systems engineering (SE) process.
2. SE and EVM Support for Performance-Based Awards, Jan. 2007
3. EVM Acquisition Reform, Nov. 2010
4. Path to EVM Acquisition Reform, May 2011
5. A Contract Requirement Rule for Program Managers," Nov. 2015
Recommends replacement of EVMS Standard EIA-748 with Project Management Institute Standard, PMBOK® Guide.
EVM, based on EIA-748, is used primarily by federal contractors when contractually required. A more powerful tool is the ANSI standard that is used world-wide on a voluntary basis when there are no federal requirements, PMBOK® Guide.
A Program Manager’s needs that are covered by PMBOK® Guide but are absent in EIAI-748 include:
· Technical or product baseline
· Requirements management and traceability
· Risk management
6. Better Program Management Through Digital Engineering (DE), May/June 2022
7. Better Program Management Through DE Updated, July/Aug. 2025
8. Basing Earned Value on Technical Performance, Jan. 2013
16. Practical, Performance-Based Earned Value,” May 2006
17. Practical Software Measurement, Performance-Based Earned Value” Sept. 2001
9. Integrating SE with EVM, Part 2, 2016 Issue No. 4
10. Performance-based EV in Commercial IT Projects, 2010 Issue No. 2
11. Integrating Risk Management with Earned Value Management (Risk Management Comes Out of the Closet), June1998
12. Agile Earned Value and the Technical Baseline," Sept. 2009
13. Technical Note CMU/SEI-2002-TN-016, Oct. 2002 "Using CMMI® to Improve Earned Value Management"
14. B-2 Bomber Team’s EVM Innovations Make Program Soar," Jan./Feb. 2000
15. Integrate SE with Earned Value Management and Program Management, Contractually and Practically, March 11, 2020